003 – ASSEMBLING BASE FRAME 

Take one ALUMINIUM PROFILE of 450 mm (17.7") out of the box. 

 

Take two ALUMINIUM PROFILES of 416 mm (16.4") out of the box. 

 

Take the bag labelled with 14 out of the box. You should have 14 ANGULAR MOUNTS: 

Summary of Contents for K8200

Page 1: ...LING BASE FRAME Take one ALUMINIUM PROFILE of 450 mm 17 7 out of the box Take two ALUMINIUM PROFILES of 416 mm 16 4 out of the box Take the bag labelled with 14 out of the box You should have 14 ANGUL...

Page 2: ...Slide 2 of these ANGULAR MOUNTS in each side of the ALUMINIUM PROFILE of 450 mm 17 7...

Page 3: ......

Page 4: ...Slide an ALUMINIUM PROFILE of 416 mm 16 4 on each side of the ALUMINIUM PROFILE of 450 mm 17 7...

Page 5: ...Tighten all the bolts firmly and make sure all angles are 90 and all ALUMINIUM PROFILES are flush...

Page 6: ...You should have this...

Page 7: ...Take the bag labelled with 15 out of the box You should have these parts Take the bag labelled with 16 out of the box You should have a bag with 34 square nuts...

Page 8: ...be an M5 nut on the bolt Screw a regular M5 nut an M5 flat washer and a square M5 nut on the foot Repeat this 4 times Do not tighten these nuts Slide these assemblies into the ends of each 416 mm 16...

Page 9: ...Tighten the nuts firmly as in the picture below...

Page 10: ...The frame should look like this...

Page 11: ...Take two rods out of the bag labelled with 7 These rods should have a diameter of 10 mm 0 39 and a length of 450 mm 17 7 Slide the two rods into the linear bearings as shown in the pictures below...

Page 12: ......

Page 13: ...Now take 4 pieces as shown in the picture below out of the bag containing the plastic parts ROD CLAMP X Slide the 4 ROD CLAMP X pieces over the ends of each rod...

Page 14: ...Take all the M5 bolts out of the bag labelled with 17...

Page 15: ...Insert these bolts in each of the ROD CLAMP X pieces as follows...

Page 16: ......

Page 17: ...Screw an M5 square nut on each of the bolts Do not tighten these nuts The X CARRIAGE should look like this...

Page 18: ...Now slide the X CARRIAGE into the frame as shown in the pictures below Do this with the side of the motor first...

Page 19: ......

Page 20: ...Now slide 2 square M5 nuts into the right ALUMINIUM PROFILE as shown...

Page 21: ...Slide one square M5 nut into the left ALUMINIUM PROFILE as shown...

Page 22: ...NT on the end of the frame Make sure the X CARRIAGE is level and parallel inside the frame Also check if the BEARING CLAMP X pieces are still in the right place The bolts holding these pieces in place...

Page 23: ...Take one ALUMINIUM PROFILE of 450 mm 17 7 out of the box and slide it down the two ANGULAR MOUNTS...

Page 24: ...Now slide the ALUMINIUM PROFILE and the 2 ANGULAR MOUNTS inside the frame...

Page 25: ...If the ALUMINIUM PROFILE is flush with the rest of the frame you can tighten all the bolts of the ANGULAR MOUNTS...

Page 26: ......

Page 27: ...BEARING CLAMP X pieces are still in the right place you can tighten these bolts holding them in place Make sure the X CARRIAGE can move freely Check if the X CARRIAGE is centred you should measure app...

Page 28: ...Now tighten the bolts on de ROD CLAMP X pieces securing the X carriage in place...

Page 29: ...EARING CLAMP Y pieces and the LINEAR BEARINGS in the BEARING CLAMP X pieces You can slide these bearings a few millimetres out of the way when there is not enough clearance The 2 carriages should now...