background image

 

Slide 2 of these ANGULAR MOUNTS in each side of the ALUMINIUM PROFILE of 450 mm (17.7"). 

Summary of Contents for K8200

Page 1: ...LING BASE FRAME Take one ALUMINIUM PROFILE of 450 mm 17 7 out of the box Take two ALUMINIUM PROFILES of 416 mm 16 4 out of the box Take the bag labelled with 14 out of the box You should have 14 ANGUL...

Page 2: ...Slide 2 of these ANGULAR MOUNTS in each side of the ALUMINIUM PROFILE of 450 mm 17 7...

Page 3: ......

Page 4: ...Slide an ALUMINIUM PROFILE of 416 mm 16 4 on each side of the ALUMINIUM PROFILE of 450 mm 17 7...

Page 5: ...Tighten all the bolts firmly and make sure all angles are 90 and all ALUMINIUM PROFILES are flush...

Page 6: ...You should have this...

Page 7: ...Take the bag labelled with 15 out of the box You should have these parts Take the bag labelled with 16 out of the box You should have a bag with 34 square nuts...

Page 8: ...be an M5 nut on the bolt Screw a regular M5 nut an M5 flat washer and a square M5 nut on the foot Repeat this 4 times Do not tighten these nuts Slide these assemblies into the ends of each 416 mm 16...

Page 9: ...Tighten the nuts firmly as in the picture below...

Page 10: ...The frame should look like this...

Page 11: ...Take two rods out of the bag labelled with 7 These rods should have a diameter of 10 mm 0 39 and a length of 450 mm 17 7 Slide the two rods into the linear bearings as shown in the pictures below...

Page 12: ......

Page 13: ...Now take 4 pieces as shown in the picture below out of the bag containing the plastic parts ROD CLAMP X Slide the 4 ROD CLAMP X pieces over the ends of each rod...

Page 14: ...Take all the M5 bolts out of the bag labelled with 17...

Page 15: ...Insert these bolts in each of the ROD CLAMP X pieces as follows...

Page 16: ......

Page 17: ...Screw an M5 square nut on each of the bolts Do not tighten these nuts The X CARRIAGE should look like this...

Page 18: ...Now slide the X CARRIAGE into the frame as shown in the pictures below Do this with the side of the motor first...

Page 19: ......

Page 20: ...Now slide 2 square M5 nuts into the right ALUMINIUM PROFILE as shown...

Page 21: ...Slide one square M5 nut into the left ALUMINIUM PROFILE as shown...

Page 22: ...NT on the end of the frame Make sure the X CARRIAGE is level and parallel inside the frame Also check if the BEARING CLAMP X pieces are still in the right place The bolts holding these pieces in place...

Page 23: ...Take one ALUMINIUM PROFILE of 450 mm 17 7 out of the box and slide it down the two ANGULAR MOUNTS...

Page 24: ...Now slide the ALUMINIUM PROFILE and the 2 ANGULAR MOUNTS inside the frame...

Page 25: ...If the ALUMINIUM PROFILE is flush with the rest of the frame you can tighten all the bolts of the ANGULAR MOUNTS...

Page 26: ......

Page 27: ...BEARING CLAMP X pieces are still in the right place you can tighten these bolts holding them in place Make sure the X CARRIAGE can move freely Check if the X CARRIAGE is centred you should measure app...

Page 28: ...Now tighten the bolts on de ROD CLAMP X pieces securing the X carriage in place...

Page 29: ...EARING CLAMP Y pieces and the LINEAR BEARINGS in the BEARING CLAMP X pieces You can slide these bearings a few millimetres out of the way when there is not enough clearance The 2 carriages should now...

Page 30: ......

Reviews: