background image

21

P

 

T

8.

 

 

 

.03.2011 

Preparation

The proced

 

Switch

 

Set ‘co

 

Sort to

The followin

 

SMT Tw

 

Flux di

 

Low so

Temperatur

In normal o
system is d
150W short
maximum o
In normal u
provided by

Soldering 

 

PREPARA
centre o
thicknes
apply so

o

 

[A] 

P

o

 

[B] 

R

the c
durin
phase

o

 

[C] 

S

o

 

[D] 

C

Desolderin

 

PREPARA
centre o

o

 

[A] 

P

o

 

[B] 

R

the c
durin
time 

o

 

[C] 

S

o

 

[D] 

C

Aftercare 

 

Clean flu

 

Check so

 

Test  

.

 

Q&A 

What Top H

Between

What’s the 

Approxim
Move th
compone

What pre-h

Between

ure for prep

h on and war

ontrol setting

ools and flux

ng tools are 

weezers, fin

ispenser bot

olids and gel

re profile 

operation the

esigned for 

t wave IR lam

of 650W med

use, approxim

y the back h

 

ATION: plac

of the PCB pr

ss). Place an

older paste to

PREHEAT the
REFLOW: use

omponent u

ng the reflow

e time (norm

SOAK for a s

COOL: allow

ng 

ATION: plac

of the PCB pr

PREHEAT the
REFLOW: use

omponent u

ng the reflow

 (normally 3

SOAK for a s

COOL – allow

ux residue of

older joints 

Heat setting 

n 220 and 38

working dist

mately 5~10

e hand tool 

ent.  

eater setting

n 200 and 29

aring to rew

rm up.  
gs’ required 

xes required.

 required for

e tipped  

ttle  

/paste flux  

e component

rework sing

mp focused 
dium wave I
mately 25%

eater (pre-h

e the PCB in

re-heater. Fo

d align comp

o the PCB be

e fluxed com

e the IR han

p to reflow t

w phase so th

mally 30-45 
short period 

 the compon

e PCB in the

re-heater. Ap
e fluxed com

e the IR han

p to reflow t

w phase so th

0-45 second

short period 

w the compo

ff PCB if nec

 

should you u

80°C. Norma

tance of the

0 mm when 

in a scannin

g should I us

90°C. Norma

work SMT/BG

for PCB/com

.  

r use in solde

 

t is first put
le/double sid

through a re

IR.  

 of the energ

heater). Figu

n the PCB ho

or BGAs, app

ponent. 

Not

efore placing

mponent/PCB

nd tool (oper

temperature

herefore we 

seconds for 
soak (about

nent to cool 

e PCB holder

pply a very s

mponent/PCB

nd tool (oper

temperature

herefore we 

ds for a smal

soak (about

onent to coo

cessary  

use? 

al setting is 

 IR Hand too

reworking a

g motion to

se?  

al setting is 

VTSDIR 

6

GA componen

mponent  

ering/desold

 through a p

de and mixe

eflective cha

gy is proved

re below sho

older, positio

ply a very sm

te

 – dependi

g component

B to approxim

rated by pre

e (200-225°C

use the time

 a small PCB

t 10 seconds

to below 18

r, positioning

small amoun

B to approxim

rated by pre

e (200-225°C

use the time

ll PCB).  

t 10 seconds

l to below 18

240°C. 

ol and how d

nd move up

 heat leads, 

240°C. 

nts is as follo

dering operat

preheat stage

d technology

amber system

d by the top 

ows how the

ning the com

mall amount

ng on the ap

t. 

mately 120°C

ssing the foo

C). It is not 

er on the IR

B).  

s) the compo

0°C before m

g the compon

nt of flux und

mately 120°C

ssing the foo

C). It is not 

er on the IR8

s) the compo

80°C before

do I move it 

 to 30mm w

 taking abou

ows:  

tions:  

e, followed b

y PCB. The t

m. The botto

heater, and

e energy is a

 

mponent site

 of gel flux (

pplication, y

C (as measu

otswitch) for

so easy to m

 810 control

onent allowin

moving the P

nent site to 
der/around t
C (as measu

otswitch) for

so easy to m

810 controlle

onent allowin

 moving the

 for rework?

when removin

ut one secon

by a reflow s

top heat is d

om heater de

 75% of the

applied to a c

e to be rewo

(approx. 0.1

you may be r

ured by the I

r the reflow 

measure tem

ler to limit t

ng the joints

PCB.  

be reworked

the compone

ured by the I

r the reflow 

measure tem

er to limit th

ng the joints

 PCB.  

  

ng compone

d for each sc

©

Velleman

stage. The 

derived from

elivers a 

 energy is 

component. 

rked over th
 - 0.15mm)

required to 

IR sensor).  

phase to hea

mperature 

he reflow 

s to fully bon

d over the 

ent.  

IR sensor).  

phase to hea

mperature 

he reflow pha

s to fully bon

nts. 

can of the 

n nv 

 a 

  

he 

 

 

at 

nd.  

 

at 

ase 

nd.  

Summary of Contents for VTSDIR

Page 1: ...V IN US VTSD NFRA RE SER MAN DIR ED SMD UAL BGA RE EWORK S 3 STATION N ...

Page 2: ...VTSDIR 21 03 2011 Velleman nv 2 Main station front panel Main station rear panel Figure ...

Page 3: ...g th work BGA re ut first cons children Yo re to take t Always conne rd Be sure t uids or other e mains befo Death or se re nor use th move the AC eriod of time sed for sold manufacturer r intermitte hould be use back in its co le it is in the hand tool o your eyes s as serious VTSDIR 3 er man this produc e indicates th f the unit or cycling This ocal environ disposal au e manual tho r use it and ...

Page 4: ...ture ng alloys use this type of s equirements king tempera f heat Do n n as burning ommencing m sult from el commencing y liquid to fa cal compone n and unaut d Quality W p this device from dust an shocks and ons of the de forbidden fo nty d purpose U rtain guidelin y for any ens this manual witch I So ounting up temperature temperature d tool power degrees Cels in degrees F for TIMER display Proc...

Page 5: ... count the number of seconds that the IR heating was on Timer down operation Set the SOLDERLIGH TIMER switch 1 to the TIMER position O Set the Time counting switch 2 to the DOWN position O Set the timer using the 3 and 4 keys Press and hold 2s to increase setting speed Read the time in seconds on the display 9 Press on the footswitch to start IR heating release to stop IR heating The timer display...

Page 6: ...r temperature herefore we seconds for soak about nent to cool e PCB holder pply a very s mponent PCB nd tool oper temperature herefore we ds for a smal soak about onent to coo cessary use al setting is IR Hand too reworking a g motion to se al setting is VTSDIR 6 GA componen mponent ering desold through a p de and mixe eflective cha gy is proved re below sho older positio ply a very sm te dependi ...

Page 7: ...s not so easy to measure temperature during the reflow phase so therefore we use the electronic process timer to warn us when the reflow phase time is over 9 Technical specifications mains power 230VAC IR solderlight power 150W temperature range 45 350 C time setting 0 900s pre heater power 650W temperature range 100 350 C dimensions controller 170 x 158 x 137 mm pre heater 280 x 90 x 260 mm weigh...

Page 8: ...VTSDIR 21 03 2011 Velleman nv 8 Appendix 1 Remove screws X remove metal bar Y and remove plastic tubes Z ...

Page 9: ...VTSDIR 21 03 2011 Velleman nv 9 Place the metal grid and secure it with the two screws X ...

Page 10: ...VTSDIR 21 03 2011 Velleman nv 10 Appendix 2 ...

Page 11: ...VTSDIR 21 03 2011 Velleman nv 11 ...

Page 12: ...t or indirect damage caused after delivery to the article e g by oxidation shocks falls dust dirt humidity and by the article as well as its contents e g data loss compensation for loss of profits frequently replaced consumable goods parts or accessories such as batteries lamps rubber parts drive belts unlimited list flaws resulting from fire water damage lightning accident natural disaster etc fl...

Reviews:

Related manuals for VTSDIR