F. Changing Adjustable Parameters (continued)
Example Pump Parameter selections (continued):
Multiple Boilers with Boiler Piped Indirect Water Heater
Sequencer Master
(Boiler 1)
Boiler 2
Wiring locations:
Enable/Disable
X
DHW Demand
X
System pump
X
DHW pump
X
Boiler Pump
X
X
Sequencer Master Parameter Selections:
Sequencer Master
Enabled
Indirect Water
Heater
“Boiler Piped”
Pump Parameter Selections:
System Pump =
Central Heat,
No Priority
Never
Boiler Pump =
Central Heat,
Off DHW Priority
Any
demand
DHW Pump =
Boiler Piped IWH
Never
Explanation:
Make sure indirect water heater and DHW pump are sized to maintain flow though boiler within limits shown in Table 12.
This piping arrangement does not allow both the Slave 1’s boiler and domestic hot water pump to run at the same time.
When call for Domestic Hot Water is received the DHW pump is turned on and the boiler pump is turned off. However, the
system pumps may run to satisfy a central heat demand that is being satisfied by a different slave. The central heat demand
is ignored by Slave 1 until the domestic hot water demand is ended. If domestic hot water priority is enabled and priority
protection time is exceeded the domestic hot water pump turns off to allow the boiler pump to run.
Summary of Contents for Phantom-X PHNTM399C
Page 49: ...49 106309 03 4 19 VI Water Piping and Trim continued Figure 28 Near Boiler Piping Heating Only...
Page 63: ...63 106309 03 4 19 VIII Electrical continued Figure 40 Ladder Diagram...
Page 64: ...64 106309 03 4 19 VIII Electrical continued Figure 41 Wiring Connections Diagram 2...
Page 73: ...73 106309 03 4 19 IX System Start up continued Figure 47 Operating Instructions...
Page 124: ...124 106309 03 4 19 XIII Service Parts continued...
Page 130: ...130 106309 03 4 19 XIII Service Parts continued...
Page 133: ...133 106309 03 4 19 XIII Service Parts continued 10A 10B 10C 10D 10G...
Page 139: ...139 106309 03 4 19...