10
106309-03 - 4/19
NOTICE
Do not drop boiler.
A. Move boiler
to approximate installed position.
B. Remove all
crate fasteners.
C. Lift and remove
outside container.
D. Remove boiler
from cardboard positioning sleeve
on shipping skid.
E. Move boiler
to its permanent location.
I. Product Description, Specifications and Dimensional Data
(continued)
Table 3: Ratings
II. Unpacking Boiler
Phantom X Series Gas-Fired Boilers
Model
Number
Input (MBH)
Gross Output
(MBH)
Net Ratings Water
1
(MBH)
Thermal
Efficiency (%)
Combustion
Efficiency (%)
Min.
Max.
PHNTM399C
80
399
375
326
94.1
94.5
PHNTM500C
100
500
485
422
97.0
96.0
PHNTM600C
125
625
594
517
95.0
96.0
PHNTM700C
145
725
689
599
95.0
95.0
PHNTM800C
160
800
760
661
95.0
94.0
Ratings shown are for installations at sea level and elevations up to 2000 ft. at minimum vent length. For elevations above 2000
ft., see Appendix A Instructions for High Altitude Installations above 2000 ft.
1
Net AHRI Water Ratings based on allowance of 1.15. Consult manufacturer before selecting boiler for installations having
unusual piping and pickup requirements, such as intermittent system operation, extensive piping systems, etc.
Summary of Contents for Phantom-X Series
Page 49: ...49 106309 03 4 19 VI Water Piping and Trim continued Figure 28 Near Boiler Piping Heating Only...
Page 63: ...63 106309 03 4 19 VIII Electrical continued Figure 40 Ladder Diagram...
Page 64: ...64 106309 03 4 19 VIII Electrical continued Figure 41 Wiring Connections Diagram 2...
Page 73: ...73 106309 03 4 19 IX System Start up continued Figure 47 Operating Instructions...
Page 124: ...124 106309 03 4 19 XIII Service Parts continued...
Page 130: ...130 106309 03 4 19 XIII Service Parts continued...
Page 133: ...133 106309 03 4 19 XIII Service Parts continued 10A 10B 10C 10D 10G...
Page 139: ...139 106309 03 4 19...