39
VII. Venting
D. Design Requirements Unique to Split Vent Systems (continued)
Option #
25
26
27
28
29
30
31
32
33
34
35
36
37
38
Illustrated in Figure
7.22
7.22
7.22
7.22
7.22
7.22
7.22
7.22
7.23, 7.24
7.23, 7.24
7.23, 7.24
7.23, 7.24
7.23, 7.24
7.23, 7.24
Pipe Penetration
Through Structure
Vent
Roof
Roof
Roof
Roof
Roof
Roof
Roof
Roof
Roof
Roof
Roof
Roof
Roof
Roof
Intake
Wall
Wall
Wall
Wall
Wall
Wall
Wall
Wall
Wall
Wall
Wall
Wall
Wall
Wall
Material
Vent
CPVC/PVC
(Note 2)
CPVC/PVC
(Note 2)
DuraVent
PolyPro
(Ridged)
DuraVent
PolyPro
(Ridged)
Selkirk
Polyflue
Selkirk
Polyflue
Centrotherm
InnoFlue SW
Centrotherm
InnoFlue
SW
DuraVent
PolyPro
(Rigid/Flex)
DuraVent
PolyPro
(Rigid/Flex)
Selkirk Polyflue
(Rigid/Flex)
Selkirk Polyflue
(Rigid/Flex)
Centrotherm
InnoFlue
(Rigid/Flex)
Centrotherm
InnoFlue
(Rigid/Flex)
Intake
PVC
PVC
PVC
PVC
PVC
PVC
PVC
PVC
PVC
PVC
PVC
PVC
PVC
PVC
Nominal Diameter
Vent
2"
3"
2"
3"
2"
3"
2"
3"
2"
3"
2"
3"
2"
3"
Intake
2" or 3"
3"
2" or 3"
3"
2" or 3"
3"
2" or 3"
3"
2" or 3"
3"
2" or 3"
3"
2" or 3"
3"
Min Equivalent Vent Length:
Min Equivalent Vent Length:
Model Sizes
85
30"
30"
30"
30"
30"
30"
30"
30"
30"
30"
30"
30"
30"
30"
110
30"
30"
30"
30"
30"
30"
30"
30"
30"
30"
30"
30"
30"
30"
155
Not Permitted
30"
Not Permitted
30"
Not Permitted
30"
Not
Permitted
30"
Not
Permitted
30"
Not Permitted
30"
Not Permitted
30"
205
30"
30"
30"
30"
30"
30"
30"
270
30"
30"
30"
36"
30"
30"
30"
Max Equivalent Vent Length (Note 1):
Max Equivalent Vent Length (Note 1):
Model Sizes
85
60ft
135ft
60ft
135ft
60ft
135ft
60ft
135ft
60ft
135ft
60ft
135ft
60ft
135ft
110
60ft
135ft
60ft
135ft
60ft
135ft
60ft
135ft
60ft
135ft
60ft
135ft
60ft
135ft
155
Not Permitted
135ft
Not Permitted
135ft
Not Permitted
135ft
Not
Permitted
135ft
Not
Permitted
135ft
Not Permitted
135ft
Not Permitted
135ft
205
135ft
135ft
135ft
135ft
135ft
135ft
135ft
270
135ft
135ft
135ft
135ft
135ft
135ft
135ft
Rigid Vent Terminals
Vent
Coupling
w/Screen
Coupling
w/Screen
2PPS-12B or
2PPS-36B
w/Screen
3PPS-12B or
3PPS-36B
w/Screen
2PF-10UV or
2PF-39UV
w/Screen
3PF-10UV or
3PF-39UV
w/Screen
ISEP02 or
ISEP0239 w/
Screen
ISEP03 or
ISEP0339
w/Screen
Not Permitted
Intake
90 Elbow
w/Screen
90 Elbow
w/Screen
90 Elbow
w/Screen
90 Elbow
w/Screen
90 Elbow
w/Screen
90 Elbow
w/Screen
90 Elbow w/
Screen
90 Elbow w/
Screen
Flex Termination
& Components
(Masonry Chimney
Chase) (Note 3)
Vent
Not Permitted
Not Permitted
2PPS-FK
2PPS-
FLEX**
3PPS-FK
3PPS-
FLEX**
2PF-FLEX-KIT
2PF-FLEX
3PF-FLEX-KIT
3PF-FLEX
IFCK02**
IFCK03**
Intake
90 Elbow
w/Screen
90 Elbow
w/Screen
90 Elbow
w/Screen
90 Elbow
w/Screen
90 Elbow
w/Screen
90 Elbow
w/Screen
Flex Termination
& Components
(B-Vent Chimney
Chase)
Vent
Not Permitted
Not Permitted
2PPS-VFT
2PPS-BF*
2PPS-
FLEX**
3PPS-VFT
3PPS-BF*
3PPS-
FLEX**
2PF-10UV or
2PF-39UV w
Screen
2PF-BVSC
(Note 4)
3PF-10UV or
3PF-39UV w
Screen
3PF-BVSC
(Note 4)
IFBK02****
IFBK03****
Intake
90 Elbow w/
Screen
90 Elbow w/
Screen
90 Elbow
w/Screen
90 Elbow
w/Screen
90 Elbow
w/Screen
90 Elbow
w/Screen
Note 1: Max vent lengths shown also apply to the intake. Flex vent reduces the maximum allowable vent length.
See equivalent lengths for flex vent shown in Table 7.14 and sizing example on page 32.
Note 2: At least 30" of CPVC pipe, and at least one CPVC elbow, must be installed between the boiler's vent connection and
PVC pipe.
Note 3: If masonry chimney contains flues in addition to that being used for chase,
ALL
must be unused.
Note 4: See Polyflue installation manual for gaskets, spacers and other required vent components.
All vertical terminals require compatible roof flashing and storm collars.
* Specify size of B vent (e.g. 2PPS-BV
6
is for use with 6" B vent).
** Specify length in feet.
**** Specify Flex length and B vent diameter (e.g. IFBK02
2505
includes 25ft of flex and used with 5" B vent).
Note 1: Max vent lengths shown also apply to the intake. Flex vent reduces the maximum allowable vent length.
See equivalent lengths for flex vent shown in Table 7.14 and sizing example on page 32.
Note 2: At least 30" of CPVC pipe, and at least one CPVC elbow, must be installed between the boiler's vent connection and
PVC pipe.
Note 3: If masonry chimney contains flues in addition to that being used for chase,
ALL
must be unused.
Note 4: See Polyflue installation manual for gaskets, spacers and other required vent components
All vertical terminals require compatible roof flashing and storm collars.
Table 7.21: Summary of Split Vent System Options
(continued)
Summary of Contents for Raptor RPTR085
Page 1: ...1...
Page 13: ...13 Figure 5 1 Wall Layout Mounting Hole Location V Mounting The Boiler continued...
Page 87: ...87 Figure 10 5 Internal Wiring Ladder Diagram X Wiring continued...
Page 88: ...88 X Wiring continued...
Page 97: ...97 Operating Instructions XI Start Up and Checkout continued...
Page 142: ...142 XV Repair Parts continued 3A 3B 3C 3D 3F 3E 3G 3H 3O 3P 3Q 3R 3J 3K 3I 3M 3N 3L All Models...
Page 148: ...148 XV Repair Parts continued 6D 6B 6A 6E 6I 6G 6L 6N 6H 6C 6K 6M 6C 6C 6J 6J 6F All Models...
Page 172: ...172...