56
VII. Venting
G. Assembly of Selkirk Polyflue Vent Systems
(continued)
e. Support each pipe section as described in Polyflue manual at intervals not exceeding the following:
Pipe size
Horizontal
Vertical
2"
30in
16ft
3"
39in
16ft
3. Installation of Air Intake System - Start assembly of the PVC air intake system at the boiler. Assembly of the air intake
system is done in the same manner as the vent system except as follows:
a. Drill a 7/32" clearance hole into the front side of the air intake adapter. Insert the first piece of PVC air intake pipe into the
air intake connection and drill a 1/8" tap hole into the PVC which lines up with the 7/32" clearance hole and secure
them together with a #10 x 1" sheet metal screw. Seal the joint between the intake pipe and the adaptor with RTV.
b. All intake piping may be PVC. There is a 0" minimum clearance between the air intake piping and all types of
construction.
c. To the extent possible, pitch horizontal air intake piping towards the outside.
4. Installation of Horizontal Fitting Terminals (Terminal Option A):
a. See Figure 7.41 for proper orientation of twin pipe horizontal terminals. Outer edge of exhaust coupling must be 10" or
less from the wall surface. (Figure 7.9)
b. Remove the gasket from the end of the integral exhaust coupling and insert Selkirk #2PF-HVST or #3PFHVST in its
place.
c. Add PVC intake per instructions from Part VII-F.
5. Installation of Vertical Fitting Terminals (Terminal Option H):
a. See Figure 7.42 for the proper orientation of twin pipe vertical terminals.
b. Remove the gasket from the end of the integral exhaust coupling and insert Selkirk #2PF-HVST or #3PFHVST in its
place.
c. A 180° bend (or two 90° elbows) are installed on the top of the air intake pipe. If two 90° elbows are used, the rodent
screen provided can be installed between them (Figure 7.42). If a 180° bend is used, install the rodent screen in the open
side of the bend, using a ring made of PVC pipe. If desired, the termination fittings can be attached to the end of the intake
pipes with field supplied stainless steel screws so that they can be later removed for cleaning and inspection. If this is
done, drill a clearance hole in these fittings and a tap hole in the end of the intake pipes to accept these screws.
d. Use roof flashings and storm collars to prevent moisture from entering the building. Seal the roof flashing to the roof
using generally accepted practice for the type of roof on the installation. Apply RTV to seal the storm collars to the vent
and intake pipes.
WARNING
Asphyxiation Hazard. Selkirk Polyflue vent systems rely on gaskets for proper sealing. When this vent
system is used, take the following precautions:
• Make sure that gasket is in position and undamaged in the female end of the pipe.
• Make sure that both the male and female pipes are free of damage prior to assembly.
• Only cut vent pipe as permitted by the vent manufacturer in accordance with their Instructions. When
pipe is cut, the cut end must be square and carefully de-burred prior to assembly.
• Use pipe locking bands at all vent pipe joints.
NOTICE
The venting system must be free to expand and contract and supported in accordance with the
installation instructions included by the original PolyPropylene venting component manufacturer, Selkirk.
PolyPropylene pipe sections must be disengaged 1/8 to 1/4 in. (3mm to 6mm) per joint to allow for thermal
expansion.
Summary of Contents for Raptor RPTR085
Page 1: ...1...
Page 13: ...13 Figure 5 1 Wall Layout Mounting Hole Location V Mounting The Boiler continued...
Page 87: ...87 Figure 10 5 Internal Wiring Ladder Diagram X Wiring continued...
Page 88: ...88 X Wiring continued...
Page 97: ...97 Operating Instructions XI Start Up and Checkout continued...
Page 142: ...142 XV Repair Parts continued 3A 3B 3C 3D 3F 3E 3G 3H 3O 3P 3Q 3R 3J 3K 3I 3M 3N 3L All Models...
Page 148: ...148 XV Repair Parts continued 6D 6B 6A 6E 6I 6G 6L 6N 6H 6C 6K 6M 6C 6C 6J 6J 6F All Models...
Page 172: ...172...