Instructions for the installer, maintenance
technician and final user
20
© SandenVendo Europe SpA
3 INSTALLATION
3.1 Transport and Positionning
MODEL
A
(mm)
B
(mm)
C
(mm)
NET WEIGHT
(Kg)
DL6 - DV6
DC6 - DM6
1900
960
890
295
DL9 - DV9 - DM9
1900
1235
890
345
DL6OD - DV6OD
DC6OD - DM6OD
1960
1100
1100
325
DL9OD - DV9OD
DM9OD
1960
1350
1100
375
For transport and HANDLING of the vendor follow carefully the below
instructions
:
Use a transpallet/forklift having a minimun loading capacity of 400 kg., the wooden
base (A) permits to fork the vendor on 4 sides.
If installation is not immediate position the vendor vertically in a dry and covered area.
CAUTION
: it is absolutely forbidden to transport and/or position the vendor in a
horizontal position.
If the machine is
mistakenly placed in a horizontal position
, re-position it again in
working position (vertical) and
wait at least12 hours
before starting it, otherwise it
would be possible to cause damages or anomalies to the cooling unit.
Place the vendor in the installation area, work with caution, avoid jumps and bumps.
Free the machine from its packing, extract, from the back protection grill, the power
cable and carefully place it in the final position.
FIG. 3.1
A
B
C