8
P
E
L
L
E
T
B
U
R
N
E
R
S
7.
Screw fuel feeder
The screw fuel feeder connects the fuel bunker with the burner. The screw fuel
feeder comprises a galvanized steel or stainless-steel duct 60 mm in diameter. The duct
houses a steel screw (auger) driven by an 230V AC motor over a gear. The motor is wired
with a power cable to the respective power output receptacle of the burner control unit. The
burner is fed automatically with fuel and automatically managed. If the fuel feeder duct fails
e.g. by overheating with a flame flashback, the fuel feeder stops operation which quenches
the burner. This prevents flames from propagating to the outside and a risk of fire in the
boiler room.
8.
Operating the burner
The burner shall be installed and operated according to this Manual and the
Warranty Certificate. VENMA shall not be liable for any damage resulting from improper use
of the burner.
The burner shall be cleaned and maintained according to the sound judgement of the
user. The obligatory annual inspection of the burner shall be scheduled with the authorized
technical service at least two weeks in advance.
The heating equipment safety regulations require a minimum clearance of 0.8 m
around the installed burner. Provide a sufficient clearance for service access to the burner.
The boiler room shall be a dry and well-ventilated indoor location. No flammables shall be
present near the burner