background image

Page 4

JCIH/C1 0715A

12" Round

12" Round

11 ¼"

8" Round

8" Round

8" Round

9"

16"

5"

8" Round

8" Round





Centerline

of Hood

Electrical

6 ½”

Vent Holes

8” Transition

Opening

5” x 16”

Exhaust

Opening

Centerline

of Hood

Centerline

of Hood

8” Blower

Outlets

Centerline

of Hood

Electrical

6 ½”

10 ½”

Vent Holes

12” Transition

Opening

Installation Details Continued

Connection Diagram (48”- 66” Widths)

Connection Diagram (36”- 48” Widths)

550 CFM T200 Dual Blower

(Top View)

1100 CFM T400 Dual Blowers

(Top View)

Transition Installed

(Side View)

VP565 Standard Transition

(Included)

VP564 Standard Transition

(Included)

Transition Installed

(Side View)

6)  Remove the shipping tape that is securing the E-Z Clean shields inside the hood. Remove the E-Z Clean shields by 

lightly pulling each toward the end of the hood. Gently close the back draft dampers from the top side of the hood. To 

remove the blower housings, unsnap the suitcase latches (one on each side of the housing). The housings should be 

pulled forward and gently “tipped” to clear the blower wheels and then out of the hood.

Warning:  Make sure power is off and locked at the service disconnecting 

means on the service panel during installation.

7)  Remove the blower deck assembly by removing the 12 screws around the blower mounting plate. Unplug the electrical 

connector(s) and set the blower assembly aside, taking care not to damage the blower wheels.

8)  Install an appropriate 1/2” UL listed electrical wire clamp through the electrical strap on top of the hood deck. Install 

electrical wiring from the service panel to the final hood location. Consult the connection diagrams (above) for further 

details on electrical placement.

Reviews: