background image

 

5

C

 MOUNTING 

 

 
 

 

 
 
 
 

Note:  

Ensure that horizontal units are installed with a 5° fall towards the condensate drain point. 

 
TYPICAL MOUNTING 
 
1.  The HRU should be secured to the support timbers by 4 Woodscrews (25mm long x N°10 Round Head)  
2.  The angled brackets assembled with the Anti Vibration Mountings supplied to be attached to the feet of 

the HRU orientate to the diagram below for loft or ceiling mounting. 

 
             

Condensate connection

Condensate connection

Roofing joist

Fit assembled 5° angled brackets

Ceiling joist

Fit assembled 5° angled brackets

Loft mounting

Ceiling mounting

 
 

D. 

CONNECTION SPIGOTS

 

 

SPIGOT 

ASSEMBLY 

 

    

Spigot Sizes:  AM PLUS 290 – 150mm ø  

AM PLUS 375 – 200mm ø  

 
 
 
 
 
 
 

 

 
 
 
 
 

 

 

 

 

   Assembled spigot 

 
 
 
 

1.  Apply clear silicone sealant (Not supplied) to each spigot assembly as shown. Wipe off any excess 

sealant to make a good air tight seal. 

2.  For convenience the connection spigots can be fixed in one of four positions, using the bayonet 

design.  

 

Summary of Contents for Air Minder Plus

Page 1: ...ABC WHOLE HOUSE HEAT RECOVERY UNIT Installation Connection and set up Instructions READ INSTRUCTIONS IN CONJUNCTION WITH ILLUSTRATIONS PLEASE SAVE THESE INSTRUCTIONS...

Page 2: ...applications may require the installation of sound attenuation to achieve the sound levels required The unit must not be connected directly to a Cooker Hood or Tumble Dryer The Condensate Waste pipe...

Page 3: ...ONTROLLER Carton 2 8 TWO FAN BLOWER UNITS 9 TWO INLETS CARTON 2 ITEM 8 2 off ITEM 9 2 off A PREPARATION 1 Remove the contents from Carton 1 2 Remove the Air Filters from the main body 3 Release the si...

Page 4: ...on the other side of the Base Housing Inlet Item 9 Inlet Item 9 Fan blower unit Item 8 Fan blower unit Item 8 Electrical control box Ensure the Fan Units Item 8 are on either side of the Electrical Co...

Page 5: ...diagram below for loft or ceiling mounting Condensate connection Condensate connection Roofing joist Fit assembled 5 angled brackets Ceiling joist Fit assembled 5 angled brackets Loft mounting Ceiling...

Page 6: ...ns in the Tubing Note Ensure that units are installed with a 5 fall towards the condensate drain point 2 Connect the tubing Item 2 to Drain Elbow and secure into position with a Clip Band Align the el...

Page 7: ...tersink at the top of the slots provides permanent fixing Fixing Slots CONTROLLER 1 The 4 core SELV cable is wired to the controller terminals in the following order 2 Replace the Controller s front c...

Page 8: ...Low 90 m3 h Med 120 m3 h Med 140 m3 h Med 160 m3 h Med 180 m3 h High 200 m3 h High 230 m3 h High 270 m3 h High 290 m3 h AM PLUS 375 House Volume 400m3 466m3 555m3 600m3 Low 90 m3 h Low 100 m3 h Low 12...

Page 9: ...our will remain on and the Minutes will start to flash G 4 Setting the Minutes Press the or V Key to set the Minutes Press the Set Key the Minutes will remain on and the display will scroll to the nex...

Page 10: ...scribed in the Fitting and Wiring information Air Minder Plus 290 rate numbers and corresponding Airflow rates Nominal setting shown bold Air Minder Plus 375 rate numbers and corresponding Airflow rat...

Page 11: ...ng shown bold v v SET R u n n i n g T i m e 0 0 0 2 0 v v SET I n t a k E x h a 1 2 u s t 1 2 B B e House size 1 Low 1 60 Medium 5 120 Boost 3 80 4 90 5 120 6 140 7 160 8 180 9 200 House size 2 Low 2...

Page 12: ...s not permitted a link must be fitted between the JP 200 terminals on the HRU Control Panel When this link is in position and the external air temperature drops below 1 C the summer bypass will open a...

Page 13: ...against faulty material or workmanship In the event of any part being found to be defective the product will be repaired or at the Company s discretion the product will be replaced without charge pro...

Reviews: