3.0   Installation

 

 

 

 

 

 

 
 

 

 

 

 

 

 

 

 

 

 

 

 

 

3.3 

Installing the Appliance

 

 

1. Offer the mounting frame to the ventilation unit 
and fix it in position by means of the four 
machine screws and four of the washers 
supplied. The washers should be located 
between the screw heads and the mounting 
frame. 
 
2. Engage the four rubber mounting grommets in 
the ends of the mounting frame arms. The 
grommets reduce the transmission of noise and 
vibration from the ventilation unit to the mounting 
surface. 
 
3. Offer the ventilation unit to the installation site 
and fix it in position using four suitable screws 
and the remaining four supplied washers. The 
washers should be located between the screw 
heads and the mounting grommets. 

 
CAUTION: 

Ensure the case does not distort 

during fixing and making good.

 

 
4. Using the pipe and elbow, if appropriate, 
connect the drain of the unit to the drainage 
system. For watertight joints, use proprietary 
PVC pipe cement between mating components. 
 
5. Install suitable internal and external grilles and 
connect them to the ventilation unit using 
suitable 150mm flexible or rigid ventilation 
ducting and ducting components. If flexible 
ducting is used, it should be stretched fully to 
obtain the best performance.        

 

 

 

  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Fig. 4 

Summary of Contents for HR200V

Page 1: ...HR200V Ducted Heat Recovery Ventilator Installation and Maintenance Instructions PLEASE READ INSTRUCTIONS IN CONJUNCTION WITH ILLUSTRATIONS PLEASE SAVE THESE INSTRUCTIONS Stock Ref No HR200V 14120010...

Page 2: ...re that they do not play with the appliance INSTALLATION GUIDANCE 1 The installer is responsible for the installation and electrical connection of the sentinel system on site It is the responsibility...

Page 3: ...3 Warnings Safety Information Contents Section Page 1 0 Introduction 4 2 0 Site Requirements 5 3 0 Installation 6 4 0 Electrical 8 5 0 Maintenance 9...

Page 4: ...lation ducting 3 The maximum power consumption for the unit is 108w 4 The twin impeller and heat exchanger arrangement simultaneously supplies and extracts air while transferring heat from the stale e...

Page 5: ...he unit must be sited such that the ambient temperature will not exceed 40 C 9 Do not site the appliance in the vicinity of excessive levels of airborne oil or grease 10 If the unit is installed in a...

Page 6: ...ect an approved electrical control arrangement for the HR200 unit above 2 After considering the site requirements Section 2 0 select a suitable site for the unit and controllers and work out the cable...

Page 7: ...he installation site and fix it in position using four suitable screws and the remaining four supplied washers The washers should be located between the screw heads and the mounting grommets CAUTION E...

Page 8: ...es as shown in Fig 5 to a Switched fused spur or a control unit If a controller is used follow the fitting and wiring instructions supplied with the controller ensuring that the black and brown wires...

Page 9: ...of contamination experienced and according to the following procedure 3 Isolate the mains power supply 4 Remove the ducting to internal grilles Undo the two grille securing screws and remove the spig...

Page 10: ...Control Declared Max Internal External Leakage Rates for BVUs or carry over for regenerative heat exchangers only Ext Leakage Rates for Ducted UVUs 5 Internal 5 External Mixing Rate of Non Ducted BVU...

Page 11: ......

Page 12: ...rating label attached to the unit Has not been subjected to misuse neglect or damage Has not been modified or repaired by any person not authorised by the company IF CLAIMING UNDER TERMS OF GUARANTEE...

Reviews: