Installation
Integra Plus ECA MVHR Installation & Commissioning
8
Installation Guidance
The following instructions are intended to help prevent potential hazards and installation should only be carried
out by a qualified electrician and installer.
NOTE: we advise installers to fix all mains and sensor wiring prior to fixing the MVHR unit in position.
Before Installation of the Unit
Inspect the Unit
When taking delivery of the unit, check the items delivered against the enclosed delivery note. Inspect the unit
for damage in transit. If in doubt, contact Customer Services. Each box contains a Integra Plus ECA MVHR unit,
Remote Boost Switch and an accessory pack containing condensate drain link pipes, clips, energy rating labels
and product documentation.
Lift and Move the Unit Safely
On page 7 check the weight of the unit that you are installing.
Always use appropriate lifting techniques and appliances when moving heavy equipment.
Check Site Requirements and Safety Notices
Check that the physical and environmental conditions for the site meet, or exceed, the requirements detailed in
the table on page 7.
Read and observe the safety notices listed in
Warnings and Safety Information
on page 3.
Unit Installation
The Integra Plus ECA unit is typically installed on a wall in a utility room, storage cupboard, roof void, or similar.
The wall should have sufficient strength to support the unit.
Take into consideration the position of the electrical services and the condensate drain.
Ensure there is an adequate access for installation, operation and maintenance.
It is recommended that a local isolation switch is installed within 1m of the unit to facilitate future maintenance.
The unit can be mounted on a horizontal or vertical face, care should be taken to ensure the unit is angled
towards the condensate drain.