background image

INST

ALLA

TION/USE/MAINTENANCE 

GUIDE

ISO 9001:2000 - Cert. n. 1368/1

UNIT INSTALLATION

RECOMMENDATIONS FOR INSTALLATION!

Before installing the unit, ensure that:

1) the place of installation has sufficient space for carrying out installation as well as routine

and extraordinary maintenance work (see fig. 3). If the unit is installed behind a

suspended ceiling, an access should be provided;

2) there are no obstructions for air intake and delivery;

3) the water fittings are of the sizes, in the position and spaced apart as required by the

unit;

4) the  system  pressure  does  not  exceed  8  bar  for  the  water-filled  versions;

5) the electricity supply corresponds to the data on the unit rating plate and that there is

a circuit breaker switch readily accessible to the user to cut off the power supply

whenever necessary;

6) the circuit breaker is in the OFF position so that there is no voltage on the unit supply

line.

GENERAL TECNICHAL DATA

Tab. 2

possible noise being created by vibrations from the unit, it is advisable to insert a vibration-

damping joint.

N.B.

: the screw anchors, threaded rods and whatever else is necessary for accomplishing

the  installation  are 

NOT

  included  in  the  supply  of  the  air  treatment  unit.

INSTALLATION OF THE ACCESSORIES

Some examples are given below of assembling the accessories for ducted air

treatment units.

Example 1

First of all put the air filter section (SFA) on the unit intake, inserting it into the special

rim (male-female) and fixing it with the galvanised self-tapping screws 4.2x9.5.

Proceed as described above on the delivery end with the connecting flange (FAM).

Put the vibration isolation joint (GAM) on the flange and fix it using the cheese-

headed screws M8x16 and hexagon bolts.

INSTALLATION OF THE AIR TREATMENT UNIT

Preliminary operations:

-  check that the various unit components are perfectly intact;

-  check that the installation accessories and documentation are in the pack;

-  place the packed section as close as possible to the place of installation;

-  do not place tools or weights of any kind on the packed unit.

Fig. 3

P

1,5 P

Fig. 4

Drill the holes in line with the relative slots for the 6 unit screw anchors (fig. 4). Inject

thermosetting  resin  into  the  holes  and  then  insert  the  screw  anchors  (fig.  5).

MODELLO

UTC 10

UTC 20

UTC 30

UTC 40

UTC 50

UTC 60

UTC 70

Fans - Motors

No.

Standard      

Rows No.

coil      

Fittings  (ØAF) Ø

Auxiliary      

Rows No.

coil     

Fittings  (ØAC) Ø

Cond. drain fitting     (ØC) Ø mm

High

(H) mm

Lenght

(L) mm

Depht

(P) mm

(A) mm

(B) mm

N. x Ø BAM

mm

Net Weight

kg

Max.power motor input

W

Max.current motor input

A

1-1

2-1

2-1

2-1

2-1

1-1

2-2

3

3

3

3

3

4

4

1/2"

1/2"

3/4"

3/4"

1"

1"1/4

1"1/2

1

1

1

1

1

2

2

1/2"

1/2"

1/2"

1/2"

3/4"

1"

1"1/4

20

20

20

20

20

20

20

299

299

324

324

374

674

674

650

1.000

1.100

1.339

1.339

1.341

2.028

533

533

533

533

533

853

853

197

197

222

222

272

572

572

548

898

998

1.237

1.237

1.239

1.926

2xØ200

3xØ200

3xØ200

4xØ200

4xØ200

2xØ200

4xØ200

28

26

41

46

57

117

192

162

218

322

340

582

1.320

2.600

0,72

0,97

1,43

1,51

2,58

5,86

11,54

Fig. 5

Fig. 6

Fix the threaded rods of the correct length to the screw anchors (fig. 5) and insert them

into the relative slots (fig. 6). After having created a slope (max. 3 cm/m) in the direction

of the condensate outlet, lock the threaded rod with a nut and check nut. To prevent

Example 2

Proceed by inserting the manual air intake section (SSP) into the air filter section (SFA) by
means of the male-female coupling. After having secured it with the self-tapping screws (4.2
x 9.5 galvanised), anchor it to the ceiling as illustrated for the base unit in figures 4-7. Put
another connecting flange on the vibration isolation joint (GAM) and secure it using cheese-
headed screws M8x16 and hexagon bolts. Insert the straight delivery plenum (PAM) in the
connecting flange and fix it using galvanised self-tapping screws 4.2 x 9.5. Connect the air
delivery  union  with  round  fittings  (BAM)  with  the  procedure  described  above.

Electrical supply: 230 V/1/50 Hz

GAM

PAM

FAM

UTC

SFA

Fig. 7

4

Summary of Contents for UTC 10

Page 1: ...INSTALLATION USE AND MAINTENANCE GUIDE DUCTABLE AIR TREATMENT UNITS MI UTC 1105 0 VEN GB ISO9001 2000 Cert n 1368 1 ...

Page 2: ...WATER CONNECTIONS 6 Connection to the trunk line 6 Condensate water drainage 6 ELECTRICAL CONNECTIONS 6 Recommendations 6 Connections to the terminal blocks UTC 10 40 6 Connections to the terminal blocks UTC 50 7 Connections to the terminal blocks UTC 60 7 Connections to the terminal blocks UTC 70 8 TURNING THE COIL 8 SECOND PART FOR THE USER CLEANING AND MAINTENANCE 9 Routine maintenance 9 Cleani...

Page 3: ... 2 GENERAL SIZE OF DUCTWORK ACCESSORIES Tab 1 MODEL U M UTC 10 UTC 20 UTC 30 UTC 40 UTC 50 UTC 60 UTC 70 Max number per pallet Pallet size Unit overall dim mm 650x533x299 1 000x533x299 1 100x533x324 1 339x533x324 1 339x533x374 1 341x853x674 2 028x853x674 N 10 5 5 5 5 2 2 140x80 120x80 120x80 150x80 150x80 150x100 230x100 MODELS UTC 10 20 30 40 50 51 MODELS UTC 60 70 51 B 44 44 37 L 51 51 B 44 44 3...

Page 4: ...es and documentation are in the pack place the packed section as close as possible to the place of installation do not place tools or weights of any kind on the packed unit Fig 3 P 1 5P Fig 4 Drill the holes in line with the relative slots for the 6 unit screw anchors fig 4 Inject thermosetting resin into the holes and then insert the screw anchors fig 5 MODELLO UTC 10 UTC 20 UTC 30 UTC 40 UTC 50 ...

Page 5: ...e section SSP in the air filter section SFA by means of the male female coupling After having secured it with the self tapping screws 4 2 x 9 5 galvanised anchor it to the ceiling as illustrated for the base unit in figures 4 7 Put another connecting flange on the vibration isolation joint GAM and secure it using cheese headed screws M8x16 and hexagon bolts Insert the straight delivery plenum PAM ...

Page 6: ...e tray The condensate water drainage system should be fabricated in a workmanlike manner and should be periodically checked Themanufacturercannotbeheldliableforanydamagecausedbydripping intheabsenceofavalveorofperiodicmaintenanceofthedrainagesystem ELECTRICAL CONNECTIONS RECOMMENDATIONS Before carrying out electrical connections ensure that the electricity supply to the supply line has been cut of...

Page 7: ...emote control 230Vac 50Hz Cross section area 1 5 mm2 Motor power supply 230Vac 50Hz Com I II III L N PE 14 15 16 17 1 2 3 4 SDP power chart 25 26 27 28 Com III II I Remote control 230Vac 50Hz Cross section area 1 5 mm2 Com I II III Motor power supply 230Vac 50Hz L N PE 14 15 16 17 1 2 3 4 SDP power chart 25 26 27 28 blue brown grey black min med max Com XA1 blue brown orange black greeen yellow FA...

Page 8: ... line with the holes left by the knockouts 7 Fix the coil using the previously removed screws 5 8 Shift the terminal board fixing it to the side opposite the water fittings and the motor cables fixing them with their clamps Ensure that the cables pass through the hole in the side of the unit protecting them with the relative grommet If it proves easier to carry out this operation by separating the...

Page 9: ...out the filter 2 Placethefilteronaflat drysurfaceandremovetheaccumulateddustwithavacuum cleaner 3 Wash the filter with water and detergent no solvents 4 Leave the filter to dry in a ventilated place in the sun 5 Replace the filter when it is perfectly dry Please clean the air filter every working season of the unit or more frequently considering the unit activity Contact a firm specialised in diff...

Page 10: ...I N S T A L L A T I O N U S E M A I N T E N A N C E G U I D E ISO 9001 2000 Cert n 1368 1 10 ...

Page 11: ...I N S T A L L A T I O N U S E M A I N T E N A N C E G U I D E 11 ...

Page 12: ...ntilclima com DUCTABLE AIR TREATMENT UNITS MI UTC 1105 0 VEN GB All datas in this manual are no binding for Ventilclima company who takes the right without advance notice obbligation to provide to any modification for product improvenments Ventilclima takes part in EUROVENT CERTIFICATION program All products included in EUROVENT Directory ISO9001 2000 Cert n 1368 1 ...

Reviews: