HE350 - Installation and Operation Manual
65
APPENDIX 6 - INSTALLATION OF SECONDARY AIR TUBES AND BAFFLE
REMOVABLE PARTS
A
Cotter pins
(x4)
B
Air tubes
(x4)
C
C-cast baffle
(x1)
1.
Remove the inner ash retainer and the floor refractory
slab
(A & B)
.
2.
Using a power screwdriver and hex tip
5/16", remove the slab holder
(D)
and the
left refractory slab
(C)
.