20
ME300 - Installation and Operation Manual
See
Section 1.3.5: Fresh Air Intake Kit
to install this kit (K) and
Appendix 1: Optional Heat Management
Systems Installation (AC01375, AC01376 or AC01340)
to see the differents heat management systems (L)
installation.
Fresh air intake kit or forced air distribution kit installation
LEGEND
Combustible material allowed in
this area
Non-combustible material only in
this area
MINIMUM MEASUREMENTS
FOR FRESH AIR INTAKE KIT
(K)**
MINIMUM MEASUREMENTS
FOR FORCED AIR DISTRIBUTION
KIT (L)**
H*
12" (305 mm)
18" (457 mm)
J*
12" (305 mm)
18" (457 mm)
*When drywall panels or any other finishing material inside the chase around the fireplace is to be used,
add its thickness to the measurement.
** The fresh air intake kit may be installed on the left side only and the forced air distribution kit may be
installed either on the sides or on the back.
Summary of Contents for ME300
Page 12: ...12 ME300 Installation and Operation Manual ...
Page 17: ...ME300 Installation and Operation Manual 17 CLEARANCES A 16 406 mm B 46 1168 mm C 8 203 mm ...
Page 33: ...ME300 Installation and Operation Manual 33 Direct installation Exterior offset installation ...
Page 60: ...60 ME300 Installation and Operation Manual APPENDIX 2 EXPLODED DIAGRAM AND PARTS LIST ...