ME300 - Installation and Operation Manual
35
5.
Then, put the roof flashing (E) in place and seal the joint between the roof and the flashing with roofing
pitch. For sloping roofs, place the flashing under the upper shingles and on top of the lower shingles.
Nail the flashing to the roof, using roofing nails.
6.
Place the storm collar (F) over the flashing, and tighten it with the bolt supplied. Finally, seal the joint
between the storm collar and the chimney, using silicone caulking.
7.
Install the chimney cap (G).
8.
When a ventilated roof flashing is installed, precautions are to be taken not to caulk or seal the
ventilating openings.
**
THE STRUCTURAL INTEGRITY OF THE FLOOR, WALL, AND CEILING/ROOF MUST BE MAINTAINED
NOTE: THE FLOOR AND WALLS BELOW THE ATTIC MUST BE INSULATED USING THE SAME INSULATION.
Summary of Contents for ME300
Page 12: ...12 ME300 Installation and Operation Manual ...
Page 17: ...ME300 Installation and Operation Manual 17 CLEARANCES A 16 406 mm B 46 1168 mm C 8 203 mm ...
Page 33: ...ME300 Installation and Operation Manual 33 Direct installation Exterior offset installation ...
Page 60: ...60 ME300 Installation and Operation Manual APPENDIX 2 EXPLODED DIAGRAM AND PARTS LIST ...