ME300 - Installation and Operation Manual
55
The hot air gravity distribution kit must be installed respecting the following:
1.
It is recommended to wear gloves to perform this procedure.
For either AC01375 or AC01376, remove
the plates closing up the 8" dia. holes on top of the fireplace. Then, cut and remove the insulation in
order to obtain two 8" dia. openings. Then, remove the plates closing up the 8" dia. holes inside the
fireplace.
Summary of Contents for ME300
Page 12: ...12 ME300 Installation and Operation Manual ...
Page 17: ...ME300 Installation and Operation Manual 17 CLEARANCES A 16 406 mm B 46 1168 mm C 8 203 mm ...
Page 33: ...ME300 Installation and Operation Manual 33 Direct installation Exterior offset installation ...
Page 60: ...60 ME300 Installation and Operation Manual APPENDIX 2 EXPLODED DIAGRAM AND PARTS LIST ...