14
VUT/VUE 250 VB(E) EC L/R
www.ventilation-system.com
4. Condensate drainage system maintenance (4 times per year).
The condensate drainage (drain line) may get clogged by dirt and dust particles contained in the exhaust air. Check the drain line
operation by filling the drain pan under the unit with water, clean the U-trap and the drain line, if necessary.
5. Supply air flow control (twice per year).
The supply duct grille may get clogged with leaves and other objects reducing the unit performance and supply air delivery. Check the
supply grille twice per year and clean it as required.
6. Ductwork system maintenance (once in 5 years).
Even regular fulfilling of all the maintenance operations prescribed above may not completely prevent dirt accumulation in the air ducts,
which leads to air pollution and reduces the unit capacity. Duct maintenance means regular cleaning or replacement.
Summary of Contents for VUE 250 VB EC Series
Page 18: ...18 VUT VUE 250 VB E EC L R www ventilation system com ...
Page 20: ...V240EN 01 ...