SPREADER SETUP & INSTALL KITS
Setup - 18
Drill the mounting hole using a 7/32” drill bit,
remove any metal shavings, and use touch up
paint on exposed metal.
3. Install the spreader control box bracket onto the
bottom of the tray using 2) #10-32 x 1/2” machine
screws and #10-32 flange nuts.
4. Connect the battery/controller wire harness to
the battery lead on the spreader controller and
connect the motor/controller wire harness to the
motor lead on the spreader controller.
5. Route the wire harnesses
down along the cab post and
fasten to the gate cable mount
bracket using a Velcro tie.
6. Route the wire harnesses
under the foot plate of the
power unit. Fasten underneath
the foot plate and to the side
of the lower rear frame tunnel
using 2) cushioned clamps
and 1/4” x 3/4” flange bolts
and flange nuts.
7. Route the wire harnesses under the hydraulic
filter, up over the axle housing, and out the back
of the power unit.
8. Insert the battery/
controller wire har-
ness between the
power unit seat box
and canvas window
of the cab and con-
nect to the positive
and negative wires
connected to the power unit battery and fasten to
the cab wire harness using a Velcro tie.
9. Connect the harness to the power cord on the
spreader. NOTE: if the power unit is equipped
with a 3 point hitch, route the harness down
between the power unit seat box and the pivot
shaft on the 3 point hitch before connecting to
the spreader’s power cord.
10. Coil the extra wire from the battery/controller and
motor/controller wire harnesses at the back of the
power unit and fasten to the hitch frame upper
anchor bracket using a Velcro tie.