SPREADER SETUP & INSTALL KITS
Setup - 28
5. Install the rear belting pivot brace (J) and drop
curtain assembly on top of the left and right
side belting hangers (K) using 4) 3/8” x 1” bolts,
8) 3/8” flat washers, & 4) 3/8” lock nuts. Par
-
tially tighten the four bolts to help align the left
and right side belting hangers.
6.
K
K
J
J
Tighten the 8) 5/16” bolts (L) that fasten the right
and left drop curtain mounts to the hopper sup-
port tube, transmission mount plate, and hopper
support plate. Torque to 135 in-lbs (15 Nm).
7.
L
L
M
M
N
N
Tighten the 4) 3/8” bolts (M) that fasten the side
belting hangers to the right and left drop curtain
mount. Torque to 245 in-lbs (28 Nm).
8. Finish tightening the 4) 3/8” bolts (N) that fas-
ten the rear belting pivot brace to the side belt-
ing hangers. Torque to 245 in-lbs (28 Nm).
9. Install a 5/16” x 3-1/2” eyebolt on top of both
the right and left side belting hangers using a
5/16” standard nut (O) and flat washer on top
and a 5/16” lock nut (P) and flat washer under
-
neath. Orient the eyebolts as shown below
and torque the lock nuts to 135 in-lbs (15 Nm).
Check to ensure that approximately one thread
of the eyebolt is through the nylon lock nut.
10.
O
O
P
P
O
O
P
P
Fasten the clip on the supplied polymer bungee
strap to the left eyebolt and hook the opposite
end onto the right eyebolt.
11. Rotate each side of the drop curtain up into
place with one of the side curtain mounts on
each side of the side belting hanger flange until
the mounting holes are aligned.