2.0 Installation
2.5 Balance and Weighing Platform
1. Assemble the balance unit as shown below:
2. Ensure that the furnace is on a stable, level surface.
3. Place the balance on the support plate below the furnace chamber, ensuring the
front legs are located in the slots on the support plate.
4. Level the balance as detailed in the balance manufacturer’s instruction manual.
5. Open the furnace door.
6. One by one, insert the 3 ceramic tubes through the holes in the hearth, and locate
them over the three corresponding placement guides on the top of the balance.
Note:
Due to the secure fit, you may need to twist the tubes down the guides in
order for them to make full contact with the weighing platform.
7. If required, loosen the bolts securing the bottom support plate, and adjust pos-
itioning to move the balance.
10
Summary of Contents for CARBOLITE GERO AAF-BAL 11/17
Page 43: ...9 0 Wiring Diagrams 43 9 0 Wiring Diagrams ...
Page 50: ......
Page 51: ...Notes Service Record Engineer Name Date Record of Work ...