8.0
Maintenance
8.1
General Maintenance
Preventive rather than reactive maintenance is recommended. The type and frequency
depends on the product use; the following are recommended.
8.2
Maintenance Schedule
CUSTOMER
QUALIFIED PERSONNEL
DANGER! ELECTRIC SHOCK
. Risk of fatal injury. Only electrically
qualified personnel should attempt these maintenance procedures.
Maintenance
Procedure
Method
Frequency
Daily
Weekly
Monthly
Bi-
Annually
Annually
Safety
Safety Switch Function
Set a safe temperature above ambient, and
open the door to see if the heater light goes
out
Safety Switch Function
Electrical measurement
Over-Temperature
Safety Circuit
(if fitted)
Set an over-temperature setpoint lower than
the displayed temperature and check for an
over-temperature alarm as detailed in this
manual
Over-Temperature
Safety Circuit
(if fitted)
Electrical measurement
Door Plug
Visual inspection, checking the seal and
whether it is free of damage
Door Plug
Replacement where necessary
Chimney / Extraction
Check and clean if necessary
Electrical Safety
(external)
Visual check of external cables and plugs
Electrical Safety
(internal)
Physically check all connections and cleaning
of the power plate area
Function
Temperature Calibration
Tested using certified equipment, frequency
dependent on the standard required
Operational Check
Check that all functions are working normally
41
8.0 Maintenance
Summary of Contents for CARBOLITE GERO ABF 8/28
Page 11: ...Fig 14 Schematic for Mains Electrical Connections 11 3 0 Installation ...
Page 21: ...4 6 Navigation Diagram 21 4 0 2416 Controller ...
Page 33: ...5 7 Navigation Diagram 33 5 0 Afterburner 2132 Controller ...
Page 40: ...7 0 Operation Photo 3 5 40 ...
Page 53: ...Notes Service Record Engineer Name Date Record of Work ...