Transit Clamps – dependent on model: the example shown here is for the 3 litre
models; remove any transit clamps as shown. Fit the ceramic chimney to the hole
that exits the top of the chamber. Most models are supplied with an insulation piece
to fit around the chimney; fit this insulation.
Remove the complete top access panel using the hidden screw in holes in the top of
the panel; loosen the screws two turns and remove the panel.
Fit the heating elements vertically into the chamber. Handle the elements with
great care. The installation of these elements is described in section 8.9.
Connect the aluminium braids securely as indicated in the element installation
instructions.
2.5
Electrical Connections
Connection by a qualified electrician is recommended.
This product requires a single-phase A.C. supply with earth (ground), which may be Live
to Neutral non-reversible (polarised), Live to Neutral reversible (non-polarised), or Live
to Live.
Check the product rating label before connection. The supply voltage should agree with
the voltage on the label and the supply capacity should be sufficient for the current on
the label.
The supply should be fused at the next size equal to, or higher than the current on the
label. A table of the most common fuse ratings is also given towards the back of this
manual. When the mains cable is factory fitted, internal fuses are also fitted. It is
essential that the operator ensures that the product is correctly fused.
Products with a factory fitted supply cable are designed to be wired directly to an
isolator or fitted with a line plug.
Products without a factory fitted supply cable require a permanent connection to a
fused and isolated supply. The product's electrical access panel should be temporarily
removed, and connections made to the internal terminals.
If the product is to be connected by line plug. The plug should be within reach of the
operator and should be easy to remove.
When connecting the product to an isolating switch ensure that both conductors (single
phase) or on all live conductors (three phase), and should be within reach of the
operator.
The supply MUST incorporate an earth (ground).
11
2.0 Installation