Window Zoom
The image can be manipulated in the sample window by the controls in the lower right
hand side of the sample window. The image can be zoomed in and out with the + and -
buttons.
Note
: the image can also be zoomed by double clicking a position in the
sample window (this must be outside the sample grid area). To return to the original
image size select the 'Fit Window' Button.
Command Selection
The software can be navigated using the 'Text Menu' or the 'Graphic Toolbar' or
primarily the 'Process Tabs'.
Graphic Toolbar
The 'Graphic Toolbar' is shown by default but can be hidden if not required by selecting
from the text menu, Tools - Tool Bars - Show/ Hide.
Connection Status
The bottom left of the software screen is the connection status indicators for the
camera and the controller. Green indicates connected, red indicates disconnected.
4.7.1
Process Tabs
The CAF test software has been designed to maximise operator work flow by the use of
process tabs along the top of the command window on the left hand side of the screen.
The Tabs will guide you through three areas of operation:
Configure
Setting up the test operating parameters
Test
Defining the test name, starting the test and selecting
analysis type.
Analysis
Reviewing the test data analysing and storing the results
29
Summary of Contents for CARBOLITE GERO CAF G5
Page 63: ...Fig 3 Front Tube Seal Assembly Fig 4 Door Arm Assembly 63 ...
Page 64: ...Fig 5a Camera Mounting Bracket Fig 5b Lens and Camera Assembly 64 ...
Page 65: ...Fig 5c Sliding the Camera Mounting Bracket Assembly onto the Door Arm 65 ...
Page 66: ...Fig 5d Securing the Camera Mounting Bracket Assembly to the Door Arm 66 ...
Page 67: ...Fig 5e Mounting the Lens and Camera Assembly 67 ...
Page 68: ...Fig 5f Lens and Camera Assembly in Position 68 ...
Page 69: ...Fig 6a Rear View of the Standard CAF G5 Furnace Showing Brick Box Assembly 69 ...
Page 71: ...Fig 7 Front Tube Seal Position 71 ...
Page 72: ...Fig 8 Tube End Seal Assembly Tightening Sequence Fig 9 Work Tube Front Support 72 ...
Page 73: ...Fig 10 Fitting the Door Arm Assembly Fig 10a Adjusting the Door Arm Assembly 73 ...
Page 74: ...Fig 11a Furnace Case and Controls 74 ...
Page 75: ...Fig 11b Gas Inlet Pipe Fig 12 Positioning the Furnace 75 ...
Page 77: ...Fig 13c Loading Samples into the Work Tube 77 ...
Page 78: ...Fig 16 File Folder 78 ...
Page 79: ...Fig 17 Door Arm Assembly Exploded View 79 ...
Page 82: ...SST DT HT FT Fig 18 Report Sheet Page 2 Side View Plan View Fig 19 Formed Wire Sample 82 ...
Page 83: ...Fig 20 Sample Carrier Sample Tiles and Sample Positions 83 ...
Page 84: ...Fig 21a Coal and Coke Test Piece Mould Fig 21b Biomass Test Piece Mould and Hand Press 84 ...
Page 85: ...Fig 22 Sample Loading Tool Fig 23 Camera Ethernet Connection 85 ...
Page 86: ...Fig 24 LED Driver Connection 86 ...
Page 87: ...Notes Service Record Engineer Name Date Record of Work ...