C.
Rear Internal Lighting
1.
Rear
lighting
does not
illuminate
when
instrument
switch is
on and the
computer
connected
and the
software is
running.
The 'Back light is off
temperature' is lower than
the standby temperature
Increase the 'Back light off
temperature' to a value greater
than the standby temperature
The process temperature is
greater than the 'Back light
off temperature'
Allow the furnace to cool below
the 'Back light off temperature'
Increase the 'Back light off
temperature' to a value greater
than the process temperature
2.
Rear
lighting
does not
illuminate
when
instrument
switch is
on and the
computer
is not
connected.
No signal to switch lights on
from the controller
The controller is faulty
LED's faulty
Investigate or contact Carbolite
Gero
Faulty Wiring
Investigate or contact Carbolite
Gero
D.
Computer Software
1.
No image in
software
sample
window
from the
camera
Camera status
indicator is
showing red as
disconnected
Check the furnace instrument switch is
turned on
Check all the Ethernet cable connections
Close the CAF software and restart
Camera Faulty
Contact Carbolite Gero
2.
No
temperature
readings
shown in the
command
window
Controller status
indicator is
showing red as
disconnected
Check the furnace instrument switch is
turned on
Check all the serial cable connections
Close the CAF software and restart
58
Summary of Contents for CARBOLITE GERO CAF G5
Page 63: ...Fig 3 Front Tube Seal Assembly Fig 4 Door Arm Assembly 63 ...
Page 64: ...Fig 5a Camera Mounting Bracket Fig 5b Lens and Camera Assembly 64 ...
Page 65: ...Fig 5c Sliding the Camera Mounting Bracket Assembly onto the Door Arm 65 ...
Page 66: ...Fig 5d Securing the Camera Mounting Bracket Assembly to the Door Arm 66 ...
Page 67: ...Fig 5e Mounting the Lens and Camera Assembly 67 ...
Page 68: ...Fig 5f Lens and Camera Assembly in Position 68 ...
Page 69: ...Fig 6a Rear View of the Standard CAF G5 Furnace Showing Brick Box Assembly 69 ...
Page 71: ...Fig 7 Front Tube Seal Position 71 ...
Page 72: ...Fig 8 Tube End Seal Assembly Tightening Sequence Fig 9 Work Tube Front Support 72 ...
Page 73: ...Fig 10 Fitting the Door Arm Assembly Fig 10a Adjusting the Door Arm Assembly 73 ...
Page 74: ...Fig 11a Furnace Case and Controls 74 ...
Page 75: ...Fig 11b Gas Inlet Pipe Fig 12 Positioning the Furnace 75 ...
Page 77: ...Fig 13c Loading Samples into the Work Tube 77 ...
Page 78: ...Fig 16 File Folder 78 ...
Page 79: ...Fig 17 Door Arm Assembly Exploded View 79 ...
Page 82: ...SST DT HT FT Fig 18 Report Sheet Page 2 Side View Plan View Fig 19 Formed Wire Sample 82 ...
Page 83: ...Fig 20 Sample Carrier Sample Tiles and Sample Positions 83 ...
Page 84: ...Fig 21a Coal and Coke Test Piece Mould Fig 21b Biomass Test Piece Mould and Hand Press 84 ...
Page 85: ...Fig 22 Sample Loading Tool Fig 23 Camera Ethernet Connection 85 ...
Page 86: ...Fig 24 LED Driver Connection 86 ...
Page 87: ...Notes Service Record Engineer Name Date Record of Work ...