EUROBLOC
SERVICE MANUAL FOR HOIST
113/212
This document and the information contained herein, is the exclusive property of Verlinde S.A.S. and represents a non-public, confidential and proprietary trade secret that
may not be reproduced, disclosed to third parties, altered or otherwise employed in any manner whatsoever without the express written consent of Verlinde S.A.S.
Copyright © (2013) Verlinde S.A.S. All rights reserved.
06/2015
Other components inspection after overspeed
1
2
Check the fixing of counterweights
• No deformations, cracks, and so on, are allowed around the
fixing places.
Check visually the hook block (10) upper sheave block,
overload device and rope anchorage
• No deformations allowed – change accordingly.
3
4
• Inspect the rope (11).
• Check the overload device with a load.
• Check the operation of the hoist upper limit switch.
• Check that the bridge and trolley wheels have not been
damaged and are lying on the runway rails.
• Check the fixing of the machinery hoist.
Drum brake inspection after overspeed
1
2
Check the detent arm (12) for any damage
• The edge should not be deformed out of shape.
Check the shaft of the detent arm (13)
• No deformation, cracks, and so on, should be on the shaft