EUROBLOC
SERVICE MANUAL FOR HOIST
156/212
This document and the information contained herein, is the exclusive property of Verlinde S.A.S. and represents a non-public, confidential and proprietary trade secret that
may not be reproduced, disclosed to third parties, altered or otherwise employed in any manner whatsoever without the express written consent of Verlinde S.A.S.
Copyright © (2013) Verlinde S.A.S. All rights reserved.
06/2015
Disassembly
1
2
Lower the hook onto a stable working-platform. Pull with a
gloved hand some extra rope down from the drum, so that
the hook-block is free. If needed, adjust the lower limit
switch. Switch of the power supply to the hoist.
Remove the shaft fixing parts (7). Remove the hook-block
fixing parts (12). Remove the side plates (11) to separate the
shaft assembly (8) and the hook and bearing set.
3
3
For frame size VT1, VT2
Remove the sheave cover plate (5) from the rope sheave
(6).
For frame size VT3
Remove the sheave cover plate (5), rope sheave (6), and
rope sheave bearing set (7).
4
Remove the cover plate (6), locking rings (5) and extract the
hook (1) from the thrust bearing (4).