EUROBLOC
SERVICE MANUAL FOR HOIST
158/212
This document and the information contained herein, is the exclusive property of Verlinde S.A.S. and represents a non-public, confidential and proprietary trade secret that
may not be reproduced, disclosed to third parties, altered or otherwise employed in any manner whatsoever without the express written consent of Verlinde S.A.S.
Copyright © (2013) Verlinde S.A.S. All rights reserved.
06/2015
4
5
Insert the hook and the bearing set, the sheave assembly,
and the shaft assembly (8) between the side plates (11).
Tighten the hook block fixing bolts and nuts (12) and the
shaft assembly (7).
Raise the hook block. Carefully guide the rope with a gloved
hand until the hook block hangs free from the working
platform. Switch ON the power supply to the hoist.
Note: If the lower limit switch has been adjusted, readjust to the correct position.
7.2.7.2 Hook block for hoist frame size: VT1,VT2. Reeving: 04, A4.