EUROBLOC
SERVICE MANUAL FOR HOIST
167/212
This document and the information contained herein, is the exclusive property of Verlinde S.A.S. and represents a non-public, confidential and proprietary trade secret that
may not be reproduced, disclosed to third parties, altered or otherwise employed in any manner whatsoever without the express written consent of Verlinde S.A.S.
Copyright © (2013) Verlinde S.A.S. All rights reserved.
06/2015
Reassembly
1
2
Lubricate the thrust bearing (4) and the shaft of the hook (1)
and place the thrust bearing in the cross bar (3). Insert the
hook (1) into the cross bar (3). Place the locking set (2) and
secure it in place with screws.
Install the sheave cover plates (5) on the side plate (6) by
placing the tabs of the cover plates (5) into the holes in the
side plate (6).
3
4
Reassemble the rope sheave (10) along with bearing set (9).
Install the sheave assembly and the hook assembly to the
side plate (6). Install the other side plate (6) and the shaft
locking parts (8). Install the cross bar fixing part (7). Tighten
the screws to the required torque.
5
Switch ON the power supply to the crane. Raise the hook
block. Carefully guide the rope with a gloved hand until the
hook block hangs free from the working platform.