EUROBLOC
SERVICE MANUAL FOR HOIST
173/212
This document and the information contained herein, is the exclusive property of Verlinde S.A.S. and represents a non-public, confidential and proprietary trade secret that
may not be reproduced, disclosed to third parties, altered or otherwise employed in any manner whatsoever without the express written consent of Verlinde S.A.S.
Copyright © (2013) Verlinde S.A.S. All rights reserved.
06/2015
Overload protection, mechanical switch
1. Rope anchorage
2. Lever mechanism
3. Set of plate springs
4. Mechanical limit switch
5. Adjustment screw for mechanical limit switch
Disassembly
Note: The plate springs must be assembled the right way round and in proper order.
1
2
Lower the hook onto a stable working-platform. Pull some
extra rope down from the drum, so that the hook-block is
free. Switch of the power supply to the hoist.
Remove the rope anchorage. Remove the screw (6) and
washer in order to remove the sleeves (7).
3
4
Loosen the adjustment screw (5). Remove the screws in
order to remove the limit switch (4).
Remove the screw in order to remove the plate springs (3) if
the plate springs are to be replaced.