7.2.9 Rope anchorage
The free end of the rope is fixed in a suspended rope anchorage. The rope clamps ensure that the rope cannot
accidentally slip through the rope anchorage.
1. Rope
2. Rope anchorage
3. Wedge
4. Rope clamp
5. Split-pin
6. Washer
7. Shaft
Disassembly
1
2
Lower the hook onto a stable platform. Pull some more rope
off the drum with a gloved hand.
Switch OFF the power supply to the hoist.