EUROBLOC
SERVICE MANUAL FOR HOIST
23/212
This document and the information contained herein, is the exclusive property of Verlinde S.A.S. and represents a non-public, confidential and proprietary trade secret that
may not be reproduced, disclosed to third parties, altered or otherwise employed in any manner whatsoever without the express written consent of Verlinde S.A.S.
Copyright © (2013) Verlinde S.A.S. All rights reserved.
06/2015
The same hoisting machinery can undergo no more than two GOs before it must be replaced completely:
SWP = Safe Working Period
RSWP = Runtime-based Safe Working Period
GO1 = First General Overhaul
GO2 = Second General Overhaul
T = Time