EUROBLOC
SERVICE MANUAL FOR HOIST
49/212
This document and the information contained herein, is the exclusive property of Verlinde S.A.S. and represents a non-public, confidential and proprietary trade secret that
may not be reproduced, disclosed to third parties, altered or otherwise employed in any manner whatsoever without the express written consent of Verlinde S.A.S.
Copyright © (2013) Verlinde S.A.S. All rights reserved.
06/2015
Install the hoisting machinery with the mounting screws (A, B,
C,D) and grease the gear rim through the opening in the
grease cover (E).
Install the countersunk screw (7). Install the hoisting limit
switch assembly (5) with the cover.
Hoisting machinery, Frame size: VT4, VT5.
1. Hoisting gearbox
2. Hoisting motor
3. Hoisting machinery
4. Junction box
5. Hoisting limit switch assembly
Disassembly
WARNING
Lock the rope drum to prevent it from rotating when hoisting brake is
detached. The weight of falling rope can rotate the unlocked drum and cause
hazardous situation.
WARNING
The hoisting machinery is heavy. You need a lifting device when
disassembling the hoisting machinery.
CAUTION
It is recommended to replace the coupling each time when you detach the
hoisting motor from the gear. If you find any rust or other visible marks of
wear in the coupling, you must replace the coupling with new one.