EUROBLOC
SERVICE MANUAL FOR HOIST
74/212
This document and the information contained herein, is the exclusive property of Verlinde S.A.S. and represents a non-public, confidential and proprietary trade secret that
may not be reproduced, disclosed to third parties, altered or otherwise employed in any manner whatsoever without the express written consent of Verlinde S.A.S.
Copyright © (2013) Verlinde S.A.S. All rights reserved.
06/2015
5
6
Remove the lower pressure roller (4) from the bearing
assembly on the torque arm (12). Then remove the bearing
assembly from the fixing plate to separate the sleeve (13) and
the bearing (14).
Remove the upper pressure roller (1) from the bearing
assembly on the fixing plate (15). Then remove the bearing
assembly from the fixing plate to separate the sleeve (13) and
the bearing (14).
Reassembly
1
2
Assemble the bearing assembly (A) including the sleeve (13)
and the bearing (14). Install this assembly on the fixing plate
(15) with the screw (16) and the nut (17).
Assemble the bearing assembly (A) including the sleeve (13)
and the bearing (14). Install this assembly on the fixing plate
(15) with the screw (16) and the nut (17).
3
4
Clean and lubricate the surfaces of upper and lower bearings
(14) on both ends of the pressure rollers (1) and (4). Press the
bearings into the correct end of the guide rollers with a rubber
hammer.
Install the lower pressure roller assembly and the shaft (11) to
the upper pressure roller assembly with screws (10). Install
the screw and the washer and place the spring (3) over the
screw. Tighten the screw.