1. Remove the plug of the power supply cable
from the power supply socket. Open the
cable gland. Remove the temporary power
supply cable by pulling it out through the
cable entry and the cable gland.
2. Place the main power supply cable through
the cable gland and the cable entry.
Connect the cable wires to the plug.
• To ensure the correct phase sequence,
pay attention to the order of the wires
when connecting them to the plug:
Connect the power control board (PCB)
connectors L1/L2/L3 with the phases
1/2/3 according to the correct phase
sequence.
• Connect the (yellow and green)
grounding wire with grounding (GND).
3. Slide the power supply cable assembly in
place. Connect the power supply plug to
the power supply socket.
4. Install the end cover.
Install the end cover and secure the fixation with the four screws. Tighten the screws to the
correct tightening torque.
4 INSTALLATION
Este documento y la información contenida en éste son de propiedad exclusiva de Verlinde S.A.S., constituyen un
secreto comercial no público, confidencial del propietario, y no puede ser ni reproducido, divulgado a terceros,
modificado ni empleado de ninguna otra manera sin el permiso expreso escrito de Verlinde S.A.S. Copyright 2020 ©
Verlinde S.A.S. Todos los derechos reservados.
3/2020