CFDV Series Gas Fireplace
20306739
9
Finish Wall
Header
Stud
Standoffs
Top of Heat
Exhaust Vent
FP3000
Side View
W
ARNING
Never obstruct or modify the air inlet.
This may create a fi re hazard.
12” (305 mm)
8” (203 mm)
6”
(152 mm)
2
56O
”
(64 mm)
12”
(305 mm)
11”
(279 mm)
10”
(254 mm)
8” (203 mm)
6"
5"
3"
45°
1"
2
56O
”
1
56O
”
3
56O
”
4
56O
”
Figure 6 –
Mantel Clearances
Front View
Side of Fireplace
Opening
Stud
Wall
FP3013
Combustible
Material Area
FIREPLACE INSTALLATION
Figure 7 –
Securing Fireplace to Floor and Framing Studs
SECURE FIREPLACE TO FLOOR OR
FRAMING
The fi replace must be secured to the fl oor and/or to framing
studs as shown in
Figure 7
. Use two (2) wood screws or
masonry/concrete screws to secure fi replace to the fl oor.
Use four (4) screws to attach fi replace to framing. The side
nailing fl anges are
1
⁄
2
" or
5
⁄
8
" to accommodate different wall
thickness.
FINISHING MATERIAL
NOTE:
Any wiring (i.e. remote control, wall switch, and
optional fan) must be done prior to fi nal fi nishing to avoid
costly reconstruction.
Only noncombustible materials (i.e. brick, tile, slate, steel,
or other materials with a UL fi re rating of Zero) may be
used to cover the black surface of the appliance. A 300°F
minimum adhesive may be used to attach facing materials
to the black surface. If joints between the fi nished wall
and the fi replace surround are sealed, a 300°F minimum
sealant material (General Electric RTV103 or equivalent)
must be used.
Framing
Nailing
Flange
Screws
Finished Wall
Support Tabs
(Do Not Use for
Framing or Header)
Screw
Nailing
Flange
Screw
Screw
Nailing
Flange
Screw
Framing