94
PoE Power Scheduling & Reset
The power scheduling is used to control the power alive interval on PoE port. It is allowed to set the
specific interval to schedule power on/off in one week.
The current scheduling state is displayed graphically during the week. Green indicates the power is on
and red that it is off. Directly changes checkmarks to indicate which day are members of the time
interval. Check or uncheck as needed to modify the scheduling table.
1.
Day
Checkmarks indicate which day are members of the set. From Sunday to Saturday.
2.
Interval
Start - Select the start hour and minute. End - Select the end hour and minute.
There are 48 time interval one day. Each interval has 30 minutes.
3.
Action
Power On - Select the radio button to apply power on during the interval.
Power Off - Select the radio button to apply power off during the interval.
4.
PoE Power Reset
The entry is used to control the power reset time on PoE port.
It is allowed to create at maximum 5 entries for each PoE port.
Summary of Contents for VX-IGP-1204F
Page 5: ...5 Overview Overview Faceplate Panel Introduction Technical Specifications ...
Page 7: ...7 8 10 Port PL series 12 Port PL series VX IGP 1204F ...
Page 12: ...12 Quick Installation Equipment Mounting Cable Connecting Equipment Configuration ...
Page 15: ...15 Ground Connections VX IGP 1204F must be properly grounded for optimum system performance ...
Page 74: ...74 ...
Page 77: ...77 ...
Page 81: ...81 3 Confirm the file is right then click Next twice ...