Chapter 3 - Installation
_______________________________________________________________________________________________________________
MNL000624.doc
Revision 0
06/25/2019
Chemical Equipment
© Versum Materials US, LLC. as of the revision and date shown. All rights reserved.
Confidential and Proprietary Data
Page 3
-
19
Versum Materials Confidential
22
V11 Control
TB5;
11&12
Dry Contact
J1 to A position
J1 pin 1&2
J1; 12&13
Table 3-5:
Tool Input
– Valve Control, Sinking Inputs
Digital
Input #
Input Label
AP1614
DB25 Bulkhead
Connector
TB1-TB4
CONFIGURATION
22
V11 Control
TB1;
11&12
Sinking
J1; 12&13