Power cable routing method
The standard cabinet supports bottom cable access only, see Figure 4.3 below. If the user needs top cable access, please
choose the parallel cabinet cabling option, refer to Options for details.
The cabling method is the same, so we just take 250 kVA cabinet for example.
F igu re 4.3 P o wer cables wirin g ro u te o f 250 k VA (bo tto m cable access)
N o.
D es crip tion
1
Step: Remove the bottom small panel, and connect the cables to corresponding terminals.
N O T E:
1. T h e po wer cables sh o u ld be ro u ted th ro u gh tu n n els o r cable tro u gh s to avo id cable dam age
du e to m ech an ical stress an d redu ce th e EM I.
2. W h en ro u tin g th e cables in side th e cabin ets, it is requ ired to bin d an d fix th e cables to avo id
cable dam age du e to m ech an ical stress.
4 Electrical Installation
40
Vertiv™ Liebert® APM Plus User Manual
Summary of Contents for APM 0250kMK16FN02000
Page 1: ...Vertiv Liebert APM Plus User Manual 50 250 kVA UPS...
Page 8: ...vi This page intentionally left blank Vertiv Liebert APM Plus User Manual...
Page 30: ...2 Overview 22 This page intentionally left blank Vertiv Liebert APM Plus User Manual...
Page 97: ...5 Operator Control and Display Panel 89 Vertiv Liebert APM Plus User Manual...
Page 188: ...12 Specifications 180 This page intentionally left blank Vertiv Liebert APM Plus User Manual...