4.2.9 Signal Cable Connection Steps
N O T E: R espectively ro u te th e po wer cables an d sign al cables. T h e sh ieldin g co at o f sign al cable m u st
be reliably earth ed.
Two connection modes are available: top cable access, bottom cable access. Refer to Figure 4.9 below and Figure 4.10 on
the facing page for the cabling route and then connect signal cables to corresponding ports shown in Figure 4.4 on page 42.
F igu re 4.9 Sign al cables wirin g ro u te o f 250 k VA (to p cable access)
N O T E:
Step 1: Lead cables in to th e cabin et th ro u gh th e h o les.
Step 2: T h en co n n ect th em to co rrespo n din g term in als
4 Electrical Installation
50
Vertiv™ Liebert® APM Plus User Manual
Summary of Contents for APM 0250kMK16FN02000
Page 1: ...Vertiv Liebert APM Plus User Manual 50 250 kVA UPS...
Page 8: ...vi This page intentionally left blank Vertiv Liebert APM Plus User Manual...
Page 30: ...2 Overview 22 This page intentionally left blank Vertiv Liebert APM Plus User Manual...
Page 97: ...5 Operator Control and Display Panel 89 Vertiv Liebert APM Plus User Manual...
Page 188: ...12 Specifications 180 This page intentionally left blank Vertiv Liebert APM Plus User Manual...