Vertiv™ XTE 802G Generator Room Walk-In-Cabinet Description and Installation Manual
26
10.
Repeat steps 3 through 9 for all helicals paying attention to helical plate orientations and to accomplish 68.85 inch centers
between all four helicals. See
Figure 6-2:
Helical Plate Orientations and Center to Center Adjustments
11.
Install leveling hardware in the center on each helical. Each helical has one set of leveling hardware and each set of leveling
hardware consists of one threaded rod, four nuts, eight washers, and four lock washers. See
Figure 6-3:
Install Leveling Hardware