Vertiv™ XTE 802G Generator Room Walk-In-Cabinet Description and Installation Manual
55
11
OSP Cables
11.1
Important Safety Instructions
DANGER!
Adhere to the “Important Safety Instructions” starting on page vi.
11.2
Safety Precautions
DANGER!
RISK OF ELECTRICAL SHOCK, OSP CABLES
If buried cables are used, check the cable sheath for voltage in accordance with local standards. If voltage is detected, do not
proceed with the installation. Contact the supervisor and do not proceed until the voltage hazard is eliminated.
11.3
General
Install OSP cables as required per site requirements.
11.4
Sealing Cable Entries
After cables are installed, refer to “Sealing Cable Entries” on page 45 and seal all cable entries.