Vertiv™ XTE 802G Generator Room Walk-In-Cabinet Description and Installation Manual
41
6.9
Placing the XTE 802G
6.9.1
On Approved Foundation Kit
Approved Foundation Kits:
•
WIC Helical Foundation Kit
•
Combo Helical Platform
•
Combo Concrete / On The Ground Platform
The following is a typical guide. Consult your company policies for your specific installation requirements.
Perform the following steps in placing and securing the XTE 802G.
Procedure
ALERT!
During lifting, the XTE 802G must be lowered so that the XTE 802G is level and parallel to the piers. Place the XTE
802G so that it lines up with the bolt locations and clears any conduits.
1.
Set XTE 802G on foundation kit. Be sure to install and secure provided hardware between XTE 802G base and foundation kit
prior to setting the full weight of the XTE 802G.
2.
Check to be sure the XTE 802G is properly placed.
3.
Loosen the slings or remove forklift so that the full weight of the XTE 802G rests on the foundation kit.
4.
Secure the XTE 802G by bolting it to the mounting plates that are attached to the top of the piers using appropriate bolting
material. Add top washers and nuts to leveling hardware and tighten. See
NOTE!
Each pier has four sets of leveling hardware. Each set of leveling hardware has one threaded rod and four nuts and
washers. Two nuts and washers sandwich the pier top plate and the other two nuts and washers sandwich the XTE 802G
mounting plate.
5.
Verify hardware between XTE 802G base and foundation kit is tight and secure.
6.
Remove the slings, spreader bars, and tagline (if using a crane).
ALERT!
If the XTE 802G will not be powered up for an extended period, place a heat source, such as two 120 VAC 150 W
incandescent lamps inside the XTE 802G to prevent condensation. Suspend lamps to prevent contact with any structures or
equipment inside the XTE 802G.