User Manual 10H52258UM60 - Rev. 3 - 01/2019
12
APM 400/600
Mechanical Installation
Inserting direction
Figure 3-1 Liebert
®
APM – Inserting & Movement
Note
Prior to removing the packaging, visually inspect it for any damage it may have suffered during shipping. Check
that the anti-dumping label has not changed color. If any irregularities or abnormalities are detected, contact
your local Vertiv service center.
3.2
Tools
This section looks at the most commonly used tools for these procedures. The tools mentioned in this section are for
reference only, select the appropriate tools after taking the on-site installation procedures and connections into
consideration.
Warning
Ensure that the tools used when installing, operating and servicing the UPS are insulated. This safety measure is
important for professionals and service personnel who work with this UPS system.