Figure 3.3 Upflow ducting configurations for EC fans
Item
Description
1
Typical ducting. May runtoeitherside.
2
Straight sectionmust be 2.5timesthe depthof blower.
3
Ductingonly attachedtoflangeson provided plenum.
NOTE: Follow standard practices in all duct work.
2.5 Connections and System Setup
•
The unit requires a drain, whichmust comply withall applicable codes. See
Field-installed, Gravity-fed Drain
onpage 33, for details.
•
Planthe routing of wiring, piping and duct work to the unit. Refer to the appropriate piping connectionlocation
drawings, piping schematics, and electrical-connectiondrawings for your system in
•
If seismic requirements apply, consult your Vertiv representative for informationabout a seismic-rated floor
stand.
NOTE: Seal openings around piping and electrical connection to prevent air leakage. Failure to do so
could reduce the unit’s cooling performance.
2.6 Operating Conditions
The Liebert® CWmust be operated ina conditioned space withinthe operating envelope that ASHRAE recommends for
data centers. The ASHRAE recommended maximum dewpoint is 59°F (15°C). Operating the CWoutside of this envelope
candecrease equipment reliability. Refer to ASHRAE’s publication, “Thermal Guidelines for Data Processing Environments.”
Vertiv | Liebert® CW™Installer/User Guide
20
Summary of Contents for Liebert CW 038
Page 14: ...Vertiv Liebert CW Installer User Guide 14 Thispageintentionally left blank...
Page 22: ...Vertiv Liebert CW Installer User Guide 22 Thispageintentionally left blank...
Page 38: ...Vertiv Liebert CW Installer User Guide 38 Thispageintentionally left blank...
Page 80: ...Vertiv Liebert CW Installer User Guide 80 Thispageintentionally left blank...
Page 102: ...Vertiv Liebert CW Installer User Guide 102 Thispageintentionally left blank...
Page 108: ...Vertiv Liebert CW Installer User Guide 108 Thispageintentionally left blank...