Batteries Approved for Use in Liebert EXM Systems
2.5.1
Floor Installation
If the Liebert EXM or battery cabinet is to be placed on a raised floor, the UPS should be mounted
on a pedestal that will support the equipment point loading. Refer to the bottom view in
to design this pedestal.
The mechanical stops are used to prevent the cabinet from rolling and should not be used for
leveling or bearing the battery cabinet’s weight.
2.5.2 Cable Entry
Cables can enter the Liebert EXM, Liebert BDC and battery cabinets from the top or bottom
through removable metal plates.
Some plates have factory-punched holes and others are designed to allow the personnel to
punch holes for fitting and securing the conduit. Once the conduit holes are punched, these
plates should be reattached to the UPS. The conduit size and wiring method must be in
accordance with all local, regional and national codes and regulations, including NEC ANSI/NFPA
70.
Table 3
Batteries approved for use in Liebert EXM External Battery Cabinet, 880mm
Supplier
Part Number
Weight, Single
Battery, lb. (kg)
EnerSys
12HX150E
26 (11.8)
12HX205
43 (19.5)
12HX300-FR
60 (27.2)
East Penn
U1HR1500
27 (12)
45HR2000
40 (18)
HR3000
61 (28)
C&D
UPS12-150MR
27.3 (12.4)
UPS12-210MR
40 (18)
UPS12-300MR
58.4 (26.5)
Table 4
Batteries approved for use in Liebert EXM External Battery Cabinet, 1200mm
Supplier
Part Number
Weight, Single
Battery, lb. (kg)
EnerSys
12HX400-FR
80 (36.3)
12HX505-FR
103 (46.7)
12HX540-FR
106 (48.1)
East Penn
HR4000
80 (36)
31HR5000
98 (44)
HR5500
107 (49)
C&D
UPS12-350MR
67.4 (30.5)
UPS12-400MR
75.8(34.4)
UPS12-490MR
100 (45)
UPS12-540MR
100 (45)