2.0
SINGLE UPS INSTALLATION AND
COMMISSIONING
This chapter introduces the installation, cable connection and commissioning of the single UPS.
Because each site is different, this chapter provides general installation procedures and methods
for the installation engineer who should conduct the installation according to the site conditions
and requirements.
2.1
Unpacking and Inspection
The 8 and 10kVA models are shipped in a cardboard box. To unpack the UPS:
1.
Stand the box upright.
2.
Open the carton and remove the packing.
3.
Lift out the accessories and set them aside.
4.
Lift the UPS out of the box and stand it or lay it aside.
5.
Remove the UPS, as shown in
.
WARNING
Risk of improper installation. Can cause property damage, injury or death.
The UPS must be installed according to the information contained in this chapter by
properly trained and qualified personnel. If any problem is found, contact Vertiv Support
immediately at 800-543-2378.
The UPS must not be powered On without approval of the commissioning engineer.
NOTE
Three-phase, five-wire for power input—The UPS can be connected to three-phase, five-wire (A,
B, C, N, PE) TN, TT and IT AC power distribution system (IEC60364-3).
Summary of Contents for Liebert ITA2-08KRT208
Page 1: ...Liebert ITA2 8 10kVA 60Hz 208 220V Three Phase UPS User Manual...
Page 40: ...Vertiv Liebert ITA2 User Manual 34 Figure 31 Status page menus...
Page 70: ...Vertiv Liebert ITA2 User Manual 64 NOTES...
Page 71: ...Vertiv Liebert ITA2 User Manual 65...
Page 72: ...Vertiv Liebert ITA2 User Manual 66...
Page 73: ......