2.5.2 Rack Installation
Installation procedures for UPS
1.
Use eight M4 × 10 screws to attach two brackets, one on each side of the UPS front panel, as shown in
.
Figure 14 Installing brackets
NOTICE
Risk of improper transport. Can cause damage to the UPS.
Never attempt to lift or move the Liebert ITA2 with the rack brackets. The brackets and screws are not
designed to be used to lift the unit.
2.
Install the guide rails, required for rack installation.
a.
Take out the guide rails (one left guide rail and one right guide rail), guide rail screws and panel screws
from the package, distinguish the left guide rail and right guide rail according to
, and
confirm its retractable function.
Figure 15 Guide rail and screw
b.
Adjust the length of the guide rail according to the dimensions of the rack.
c.
Align the installation holes of the guide rail with the square holes of the rack, fix the guide rail onto the
rack through the guide rail screws (total of eight), each left guide rail and right guide rail requires four
guide rail screws, as shown in
.
1.
UPS
2. Bracket,
2
3. Screws, 8 (M4 x 10)
1.
Guide Rail, Left
2. Guide Rail,
Right
3. Installation Holes, 16; (4 on
each end of each rail; only 2
used on each end)
4. Screw, 8
(4 per Guide
Rail)
Summary of Contents for Liebert ITA2-08KRT208
Page 1: ...Liebert ITA2 8 10kVA 60Hz 208 220V Three Phase UPS User Manual...
Page 40: ...Vertiv Liebert ITA2 User Manual 34 Figure 31 Status page menus...
Page 70: ...Vertiv Liebert ITA2 User Manual 64 NOTES...
Page 71: ...Vertiv Liebert ITA2 User Manual 65...
Page 72: ...Vertiv Liebert ITA2 User Manual 66...
Page 73: ......