6.2 Electrical Power Requirements
6.3 Wye vs. Delta Connected Power Supply
6.4 Low Voltage Control Wiring—CANbus Communication
7 Checklist for Completed Installation
7.1 Moving and Placing Equipment
7.2 Electrical Installation Checks
7.3 Piping Installation Checks
8 Initial Startup Checks and Commissioning Procedure for Warranty Inspection
10.1 Premium Efficiency Control Board and Interface
10.1.1 Initial Display upon Power On
10.1.2 Navigating the Controller Interface Main Menu
11.2.1 When to Clean the Condenser Coil
11.2.2 What to Use to Clean the Condenser Coil
11.2.3 Cleaning the Condenser Coil
11.3 Replacing the Condenser Fan
11.3.1 Verifying the Fan Address
11.4 Replacing the Premium Efficiency Control Board
11.4.1 Preparing to Replace the Board
11.4.2 Installing the Replacement Board
12 Preventive Maintenance Checklist
Appendix A: Technical Support and Contacts
Appendix C: Optional Configuration for Liebert® MC Seismic Application or Wind Load Certification
Appendix D: Submittal Drawings
Vertiv | Liebert® MC Installer/User Guide |
ii
Summary of Contents for Liebert MC series
Page 1: ...Liebert MC Installer User Guide 60 Hz Air Cooled Microchannel Condenser Premium EC Fan ...
Page 8: ...Vertiv Liebert MC Installer User Guide 4 This page intentionally left blank ...
Page 14: ...Vertiv Liebert MC Installer User Guide 10 This page intentionally left blank ...
Page 28: ...Vertiv Liebert MC Installer User Guide 24 This page intentionally left blank ...
Page 44: ...Vertiv Liebert MC Installer User Guide 40 This page intentionally left blank ...
Page 46: ...Vertiv Liebert MC Installer User Guide 42 This page intentionally left blank ...
Page 48: ...Vertiv Liebert MC Installer User Guide 44 This page intentionally left blank ...
Page 76: ...Vertiv Liebert MC Installer User Guide 72 This page intentionally left blank ...
Page 88: ...Vertiv Liebert MC Installer User Guide 84 This page intentionally left blank ...
Page 90: ...Vertiv Liebert MC Installer User Guide 86 This page intentionally left blank ...